Browse through our past projects. For over 20 years, Lamont Civil Services have been providing a comprehensive range of reliable, expert civil works  and construction services for countless clients from Mt Isa and all surrounding areas.


For further information on our range of services, speak with one of our team members today.

  • CURRY PM SEDAN DIP ROAD BETTERMENT PROJECT
  • CSC T2019 RW7S FDRR TOOLEBUC-MCKINLAY ROADS
  • CSC SEDAN DIP ROAD UPGRADE
  • CSC EASTERN STORMWATER EARTHWORKS
  • CSC AIRPORT BATTER RECTIFICATION & TAXIWAY DRAIN REPLACEMENT
  • CSC STP ACCESS ROAD
  • BMD STP EARTHWORKS
  • CSC BELL & WILLS STREET UPGRADE
  • CSC SHEAFFE STREET UPGRADE STAGE 3 COMPLETION WORKS
  • CSC & SPA HENSLEY DRIVE WORKS
  • CPM CARL KATTER BRIDGE UPGRADE
  • BMD ISA STREET BRIDGE UPGRADE
  • BMD ISA STREET WORKS
  • GHD AURIZON LAYDOWN YARD WORKS
  • CSC SALEYARDS REST AREA UPGRADE
  • CSC SHEAFFE STREET UPGRADE STAGE 2
  • CSC GRIFFITH STREET UPGRADE
  • CSC RESEALS PROGRAM 18-19
  • WAGNER GFM HAULROAD UPGRADE 2018 & 2019
  • CSC SHEAFFE STREET UPGRADE STAGE 1
  • WHITTENS DUGALD RIVER GRADING, COMPACTING & REPAIR ROADS
  • MMG DUGALD RIVER DRAINS REALIGNMENT TO ROADWAY
  • CSC FDRR 2018 RW2S CHATSWORTH PHOSPHATE ROADS
  • CSC FDRR 2018 RW3S CHATSWORTH BOULIA ROADS
  • CSC FDRR 2018 RW1S BURNHAM ROAD
  • CSC FDRR 2018 RW5N GLEESON KAMILAROI ROADS
  • CSC FLOOD DAMAGE DUCHESS MOUNT ISA ROADS
  • CSC FLOOD DAMAGE CHATSWORTH BOULIA PHOSPHATE ROADS
  • CSC EMERGENT WORKS BURNHAM ROAD
  • CSC EMERGENT WORKS ZINGARI ROAD
  • CSC EMERGENT WORKS ANTION DOWNS ROAD
  • MMG DUGALD RIVER ENTRANCE ROAD
  • LEIGHTONS LEICHARDT POWER STATION ROAD WORKS
  • KBR DIAMANTINA POWER STATION ROAD WORKS
Contact us
Airport Road Upgrade Refuge — Civil Works in Mt. Isa, QLD

Project: Administration Carpark

Location: Dugald River Mine Site
Brief: Supply labour & equipment to prepare for bitumen seal - to rip, re-sheet, compact, grade existing carpark area, assist applying seal and line mark where required. Additional fill material was recommended to take into account existing low-grade surface. Bitumen costing was suggested to go directly with the client to reduce costs on mark-up.
Commitment $1.4m in plant & equipment + 6 team

Project: Light & Heavy Vehicle Wash Bay & Road Alignment 

Location: Dugald River Mine Site
Brief: Supply labour, equipment & materials to excavate, form and concrete wash bay including tie into existing road alignment. The existing road intersection leading in created problematic tie-in options to the wash bay, the Lamont team assisted in designing safer lead in for heavy equipment.
Commitment: $600k in plant & equipment + 6 team

Project: Concentrator Shed Hardstand Area

Location: Dugald River Mine Site
Brief: The existing rock covered surface was unsuitable for new infrastructure. The area had to be ripped and rolled to 200mm thickness only, mixed and stabilised with GP cement, compacted, rolled, and repeated to form the required finish. Initially, the client requested multiple options for re-surfacing the area considering the existing material was not suitable in many areas, Lamont had to provide best cost-effective options to the client.
Commitment: $3.8m plant & equipment + 6 team

Project: Village Access Road

Location: Dugald River Mine Site
Brief: Supply labour & equipment to support Lucas Group in the development of a new access road from mine site to the new camp, works included grading to required levels, bulk fill, compacting and dust suppression. Concerns regarding traffic to the village were minimised with traffic & safety management plans.
Commitment: $2.5m in plant & equipment + 8 team

Project: McNamara Road Upgrade

Location: Lady Loretta Mine Site
Brief: Road construction works under Lucas Constructions to assist in the bitumen surfacing of Lady Loretta McNamara Road. The existing road was in disrepair due to large amounts of heavy traffic and minimum road repairs/rehabilitation. Works consisted of a small crew carting fill, ensuring dust suppression and grading to required levels in preparation for surfacing. Suitable material issues were resolved with the assistance of crushing and screening on site, this saved the client costs associated with carting in additional materials to certain areas.
Commitment: $1.8m plant & equipment + 2 team

Project: Dajarra Road Culverts, Margins, Batter Protection & Upgrade

Location: Dajarra Road
Brief: Upgrade works for Dajarra Road. The works consisted of remotely located environmental aspects such as culvert cleaning, installation of new culverts, batter protection and additional civil & related road works in preparation for road surfacing.
Commitment: $6.8m plant & equipment + 15 team

Project: Carpentaria Shire Council Civil Works

Location: Various sites within the Shire
Brief: The Lamont team was awarded civil works within the Carpentaria Shire Council. The works consisted of remotely located environmental works such as culvert cleaning, installation of new culverts as well as general plant & labour hire for related road construction works. With the remoteness of the location, a transportable accommodation set up was arranged and as a result, saved our client additional accommodation costing on the job.
Commitment: $1.2m in plant & equipment + 3 personnel

Project: Ramsay Street Upgrade

Location: Ramsay Street
Brief: Works consisted of removal of existing kerb and storm water pits, driveways etc. and installation of 420m of kerb and channel, including new driveways. All kerb was raised in height to comply with Main Roads standards. Storm water and pram ramps were replaced also as to Main Roads specification. LPH assisted Fulton Hogan with equipment hire and operators when needed for asphalting of the roads. All concrete works were done on night shift as it was cooler and more productive for men to work. At Ramsay Street upgrade, we had trouble with some existing storm water regarding collapsing of existing services due to age. We overcame these issues quickly by seeking approval for replacement products that could be sourced locally. There were no delays on project completion date from these variations.
Commitment: $500k in plant & equipment + 10 team

Project Name: Diamantina Power Station

Location: Mount Isa Power Station
Brief: Contract consisted of completion of all internal bitumen roads, main site intersection from the highway - 14,000 m2 of concrete; drainage and construction of a chemical storage shed; all internal concrete repairs and variations as directed by client; earth works and site clean-up; installation of safety showers; repairs to fire water mains; construction of site access roads up to seal and line marking and signage; installation of all concrete foot paths and lightning pole protection footings. LPH also supplied labour for site support. This consisted of taking all deliveries and loading and preparing any freight from site as directed by the client for all site logistics.
Commitment: $9.8m in plant & equipment + 38 team

Project Name: Leichardt Power Station

Location: Mount Isa Power Station
Brief: LPH had an underground services contract inclusive of all civil works and had to supply all quality assurance (QA) documentation for supporting works. Works included all major poly lines. Poly welding was used for all joins and all pressure testing was carried out for all water services with QA documentation submitted to the client. Services consisted of fire mains, potable water, and wastewater. Approximately 28 km of electrical conduit inclusive of junction pits where installed as well as 12 km of earth grid.
Commitment: $4.2m in plant & equipment + 16 team

Project Name: Upgrade / Refurbishment / Development 

Coles / Woolworths / Neighbourhood Centre Mt Isa

Location: Various sites
Brief: Supply equipment, labour & materials for concrete finishing works & related services, including beautification and landscaping as well as all support services.
Commitment: $900k in plant & equipment + 7 team

Project: Culverts & Road Works

Location: Dugald River Mine Site
Brief: Supply labour & equipment to form up culverts, pour concrete to culverts, remove, and clean up area, tie in road to new culvert area.
Commitment: $540K in plant & equipment + 4 team